YP.INS.DUVAR.011In-wall tie beam concrete

Market Work Item · Construction · DUVAR

Original Turkish name: Duvar içi hatıl betonu

Item No.YP.INS.DUVAR.011
Unitm
ClassStandard
Estimated Unit Cost1.128,16 TL/mexcl. VAT

Scope

Construction of horizontal/vertical tie beams inside the wall; formwork cheeks, reinforcement, and concrete mortar are included.

Components (8) · Quick Estimate

TypeNameUnitQty/mUnit Price (TL)Amount (TL)
MaterialDry concrete mortar B20 (base)kg14,00350,00
MaterialDeformed reinforcing steel bar Ø8-Ø12ton28.666,6786,00
MaterialOSB board (11 mm)559,8883,98
MaterialWall plug and screw, calibrated 8 mmadet4,1816,72
LabourPlasterersaat466,67420,00
LabourUnskilled laborersaat333,33166,67
ToolMortar mixing paddle M14adet477,372,39
ToolSteel troweladet481,102,41
Subtotal (excl. VAT)1.128,16 TL
VAT (%20)225,63 TL
Grand Total1.353,79 TL
Wall plug and screw, calibrated 8 mm (Ma-De)BuyMortar mixing paddle M14 (Master)BuySteel trowel (Dekor)Buy

Component quantities are defaults; adjust them to your own job.

Tool rows are included with a depreciation quantity; set the quantity to 0 if not needed.

Items in the Same Group

YP.INS.DUVAR.001Autoclaved aerated concrete (AAC) wall construction (10 cm)()
YP.INS.DUVAR.002Brick wall construction (13.5 cm)()
YP.INS.DUVAR.003Pumice block wall construction (15 cm)()
YP.INS.DUVAR.004Glass block wall construction()
YP.INS.DUVAR.005Opening a door/window void in a wall(adet)
YP.INS.DUVAR.006Brick wall laying (19 cm)()
YP.INS.DUVAR.007Autoclaved aerated concrete (AAC) wall laying (15 cm)()
YP.INS.DUVAR.008Autoclaved aerated concrete (AAC) wall laying (20 cm)()
YP.INS.DUVAR.009Pumice block wall laying (20 cm)()
YP.INS.DUVAR.010Supply and placement of lintel(m)

Prices are estimated market averages; they do not belong to any single seller or platform and are not a binding quotation. Data is compiled by yap-poz.com through independent market research; it is not official unit price data.