YP.INS.DUVAR.001Autoclaved aerated concrete (AAC) wall construction (10 cm)

Market Work Item · Construction · DUVAR

Original Turkish name: Gazbeton duvar örülmesi (10 cm)

Item No.YP.INS.DUVAR.001
Unit
ClassStandard
Estimated Unit Cost606,44 TL/m²excl. VAT

Scope

Building partition walls with AAC blocks (excluding plaster).

Components (7) · Quick Estimate

TypeNameUnitQty/m²Unit Price (TL)Amount (TL)
MaterialAAC block 10 cm279,17287,55
MaterialAAC mortarkg7,0428,16
LabourPlasterersaat466,67210,00
LabourUnskilled laborersaat333,3366,67
ToolAAC sawadet1.000,0010,00
ToolNotched trowel (AAC block)adet408,252,04
ToolSpirit leveladet405,702,03
Subtotal (excl. VAT)606,44 TL
VAT (%20)121,29 TL
Grand Total727,73 TL
AAC saw (Abay)BuyNotched trowel (AAC block)BuySpirit level (Bosch)Buy

Component quantities are defaults; adjust them to your own job.

Tool rows are included with a depreciation quantity; set the quantity to 0 if not needed.

Items in the Same Group

YP.INS.DUVAR.002Brick wall construction (13.5 cm)()
YP.INS.DUVAR.003Pumice block wall construction (15 cm)()
YP.INS.DUVAR.004Glass block wall construction()
YP.INS.DUVAR.005Opening a door/window void in a wall(adet)
YP.INS.DUVAR.006Brick wall laying (19 cm)()
YP.INS.DUVAR.007Autoclaved aerated concrete (AAC) wall laying (15 cm)()
YP.INS.DUVAR.008Autoclaved aerated concrete (AAC) wall laying (20 cm)()
YP.INS.DUVAR.009Pumice block wall laying (20 cm)()
YP.INS.DUVAR.010Supply and placement of lintel(m)
YP.INS.DUVAR.011In-wall tie beam concrete(m)