YP.INS.DUVAR.004Glass block wall construction

Market Work Item · Construction · DUVAR

Original Turkish name: Cam tuğla duvar örülmesi

Price data being completed

Component prices for this item are not complete yet; it cannot be added to a calculation until published.

Item No.YP.INS.DUVAR.004
Unit
ClassPremium
Estimated Unit Costprice data being completed

Scope

Building decorative partitions with glass blocks; joints and reinforcement included.

Components (7)

TypeNameUnitQty/m²Unit Price (TL)Amount (TL)
MaterialGlass block 19×19×8 cmadet25141,58
MaterialGlass block mortarkg1price data being completed
MaterialGlass block reinforcing baradet1price data being completed
MaterialTile grout (1-6 mm)kg0.554,58
LabourPlasterersaat1.2466,67
ToolGrouting floatadet0.01501,21
ToolSpirit leveladet0.01405,70
Tile grout (1-6 mm) (Kalekim)BuyGrouting floatBuySpirit level (Bosch)Buy

Tool rows are included with a depreciation quantity; set the quantity to 0 if not needed.

Items in the Same Group

YP.INS.DUVAR.001Autoclaved aerated concrete (AAC) wall construction (10 cm)()
YP.INS.DUVAR.002Brick wall construction (13.5 cm)()
YP.INS.DUVAR.003Pumice block wall construction (15 cm)()
YP.INS.DUVAR.005Opening a door/window void in a wall(adet)
YP.INS.DUVAR.006Brick wall laying (19 cm)()
YP.INS.DUVAR.007Autoclaved aerated concrete (AAC) wall laying (15 cm)()
YP.INS.DUVAR.008Autoclaved aerated concrete (AAC) wall laying (20 cm)()
YP.INS.DUVAR.009Pumice block wall laying (20 cm)()
YP.INS.DUVAR.010Supply and placement of lintel(m)
YP.INS.DUVAR.011In-wall tie beam concrete(m)

Prices are estimated market averages; they do not belong to any single seller or platform and are not a binding quotation. Data is compiled by yap-poz.com through independent market research; it is not official unit price data.