YP.INS.ALCIPAN.009Wall lining, framed system

Market Work Item · Construction · ALCIPAN

Original Turkish name: Duvar giydirme, profilli sistem

CodeYP.INS.ALCIPAN.009
Unit
ClassStandard
Estimated Unit Cost390,94 TL/m²excl. VAT

Scope

Drywall lining on framed construction against the wall; intermediate insulation optional, paint excluded.

Components (10) · Quick Estimate

TypeNameUnitQty/m²Unit Price (TL)Amount (TL)
MaterialWhite drywall board, 12.5 mm95,2099,96
MaterialCladding profilem41,6791,67
MaterialDrywall screwadet1,0916,35
Material135,27
MaterialFiberglass joint tape 50 mmm5,997,19
MaterialDrywall joint compoundkg8,113,24
LabourPlasterersaat466,67163,33
ToolCordless screwdriveradet2.120,756,36
ToolDrywall sawadet321,081,61
ToolSpirit leveladet405,701,22
Subtotal (excl. VAT)390,94 TL
VAT (%20)78,19 TL
Grand Total469,12 TL
Drywall screw (Meridyen)BuyFiberglass joint tape 50 mm (SGS)BuyDrywall joint compound (Aygips)BuyCordless screwdriver (Bosch)BuyDrywall saw (WorkPro)BuySpirit level (Bosch)Buy

Component quantities are defaults; adjust them to your own job.

Tool rows are included with a depreciation quantity; set the quantity to 0 if not needed.

Optional components are not in the default total; tick them in the calculator to include.

Items in the Same Group

YP.INS.ALCIPAN.001Drywall suspended ceiling (double layer)()
YP.INS.ALCIPAN.002Moisture-resistant drywall suspended ceiling (bathroom/kitchen)()
YP.INS.ALCIPAN.003Fire-resistant drywall suspended ceiling()
YP.INS.ALCIPAN.004Stepped suspended ceiling with concealed lighting trough(m)
YP.INS.ALCIPAN.005Curved/decorative drywall ceiling detail(m)
YP.INS.ALCIPAN.006Drywall partition wall (double layer double face)()
YP.INS.ALCIPAN.007Sound-insulated partition wall (acoustic)()
YP.INS.ALCIPAN.008Wall lining, bonding method()
YP.INS.ALCIPAN.010Moisture-resistant drywall partition (bathroom)()
YP.INS.ALCIPAN.011Drywall niche/decorative wall (TV unit)()
YP.INS.ALCIPAN.012Cutting spotlight hole in drywall ceiling(adet)
YP.INS.ALCIPAN.013Drywall surface repair (hole/damage patch)(adet)

Prices are estimated market averages; they do not belong to any single seller or platform and are not a binding quotation. Data is compiled by yap-poz.com through independent market research; it is not official unit price data.